NAME ALIAS DESC WHEN
Highslide JS Sink & Cabinet 2018-09-12
Highslide JS Building Cabinet 2018-09-12
Highslide JS Bath Cabinet 2018-09-12
Highslide JS Start Bathroom Counter Only two workers today: Both working on plastering walls and making the top of the cabinet that will hold the bathroom sink. 2018-09-12
Highslide JS Plaastering More Walls 2018-09-12
Highslide JS Bath Counter Top Poured 2018-09-12
Highslide JS Reinforcing 2018-09-12
Highslide JS Ja Starts Bath Counter 2018-09-12
Highslide JS Bath Counter 2018-09-12
Highslide JS Cabinets & Lights The kitchen cabinets are pretty much done now except for shelves and the countertop. And now that there is electricity in the house Soi was able to wire some lights and wall switches. 2018-09-11
Highslide JS Lighted Light eerily emitted from the missing ceiling paels 2018-09-11
Highslide JS Looking In View thru kitchen door of the newly built cabinets 2018-09-11
Highslide JS Tong On Scaffolding Tong hangs out in the living room while the electricians work 2018-09-11
Highslide JS Success! Soi finally gets both lights working on their switch 2018-09-11
Highslide JS Bedroom Switch Keeping this one for posterity 2018-09-11
Highslide JS Doi & Soi Doi on ladder and Soi next to the tub that needs to be installed 2018-09-11