Highslide JS Reattached to Meter The cable was reattached to the meter - try to do that i the US! 2018-09-10
Highslide JS Cable Buried Meanwhile Soi and Doi were buried the electrical feed 2018-09-10
Highslide JS Fix Bathroom Floor Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour 2018-09-10
Highslide JS Rick Explains 2018-09-10
Highslide JS Septic Tanks The septic tanks were installed - by digging with axe and shovel. Felt kind of bad for these guys doing hard labor in the hot sun, but they were happy to get the work! 2018-09-10
Highslide JS Grade & Cover Two completed Thai-style septic tanks! 2018-09-10
Highslide JS Add Rock Back-fill with gravel 2018-09-10
Highslide JS Dig Holes Dig two holes 8 feet deep and 3 feet across and install the concrete "sleeves" 2018-09-10
Highslide JS Septic Tanks Installed 2018-09-10
Highslide JS Mae Duk 2018-04-13 2018-09-10
Highslide JS Da Gaeo 2018-02-07 2018-09-10
Highslide JS Da Jahn Visits 2017-10-20 Da Jahn visits us and his older sister Yai 2018-09-10
Highslide JS Da Jahn 2017-10-21 2018-09-10
Highslide JS Electricity & Dinner During the daytime Soi and Doi hooked up the electricity to the meter installed by the PET (Provincial Electric Authority). After work we treated many family members and the workers to dinner at MK Restaurant. 2018-09-10
Highslide JS Table III Pao, Ham, Ja, Pete, Pai, Tong 2018-09-10
Highslide JS Table II Now contains Kate, Sow, Pao, Yai 2018-09-10