NAME ALIAS DESC WHEN
Highslide JS Rick Explains Kitchen The built-in kitchen counter top is framed and poured according to Rick's instructions 2018-09-10
Highslide JS Da Gaeo Visits Da Gaeo, Yai's older brother, stops by. Por Am's wife and daughter accompany Por Am to work most days, and Mae Duk is also around a lot 2018-09-10
Highslide JS Ceiling Rafters After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above 2018-09-10
Highslide JS Electric Routed Inside Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do. 2018-09-10
Highslide JS Reattached to Meter The cable was reattached to the meter - try to do that i the US! 2018-09-10
Highslide JS Cable Buried Meanwhile Soi and Doi were buried the electrical feed 2018-09-10
Highslide JS Fix Bathroom Floor Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour 2018-09-10
Highslide JS Rick Explains 2018-09-10
Highslide JS Septic Tanks The septic tanks were installed - by digging with axe and shovel. Felt kind of bad for these guys doing hard labor in the hot sun, but they were happy to get the work! 2018-09-10
Highslide JS Grade & Cover Two completed Thai-style septic tanks! 2018-09-10
Highslide JS Add Rock Back-fill with gravel 2018-09-10
Highslide JS Dig Holes Dig two holes 8 feet deep and 3 feet across and install the concrete "sleeves" 2018-09-10
Highslide JS Septic Tanks Installed 2018-09-10
Highslide JS Mae Duk 2018-04-13 2018-09-10
Highslide JS Da Gaeo 2018-02-07 2018-09-10
Highslide JS Da Jahn Visits 2017-10-20 Da Jahn visits us and his older sister Yai 2018-09-10