Rick Explains Kitchen | The built-in kitchen counter top is framed and poured according to Rick's instructions | 2018-09-10 | ||
|
Da Gaeo Visits | Da Gaeo, Yai's older brother, stops by. Por Am's wife and daughter accompany Por Am to work most days, and Mae Duk is also around a lot | 2018-09-10 | ||
|
Ceiling Rafters | After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above | 2018-09-10 | ||
|
Electric Routed Inside | Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do. | 2018-09-10 | ||
|
Reattached to Meter | The cable was reattached to the meter - try to do that i the US! | 2018-09-10 | ||
|
Cable Buried | Meanwhile Soi and Doi were buried the electrical feed | 2018-09-10 | ||
|
Fix Bathroom Floor | Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour | 2018-09-10 | ||
|
Rick Explains | 2018-09-10 | |||
|
Septic Tanks | The septic tanks were installed - by digging with axe and shovel. Felt kind of bad for these guys doing hard labor in the hot sun, but they were happy to get the work! | 2018-09-10 | ||
|
Grade & Cover | Two completed Thai-style septic tanks! | 2018-09-10 | ||
|
Add Rock | Back-fill with gravel | 2018-09-10 | ||
|
Dig Holes | Dig two holes 8 feet deep and 3 feet across and install the concrete "sleeves" | 2018-09-10 | ||
|
Septic Tanks Installed | 2018-09-10 | |||
|
Mae Duk | 2018-04-13 | 2018-09-10 | ||
|
Da Gaeo | 2018-02-07 | 2018-09-10 | ||
|
Da Jahn Visits | 2017-10-20 Da Jahn visits us and his older sister Yai | 2018-09-10 |