NAME ALIAS DESC WHEN
Highslide JS Add Rock Back-fill with gravel 2018-09-10
Highslide JS Dig Holes Dig two holes 8 feet deep and 3 feet across and install the concrete "sleeves" 2018-09-10
Highslide JS Septic Tanks Installed 2018-09-10
Highslide JS Mae Duk 2018-04-13 2018-09-10
Highslide JS Da Gaeo 2018-02-07 2018-09-10
Highslide JS Da Jahn Visits 2017-10-20 Da Jahn visits us and his older sister Yai 2018-09-10
Highslide JS Da Jahn 2017-10-21 2018-09-10
Highslide JS Electricity & Dinner During the daytime Soi and Doi hooked up the electricity to the meter installed by the PET (Provincial Electric Authority). After work we treated many family members and the workers to dinner at MK Restaurant. 2018-09-10
Highslide JS Table III Pao, Ham, Ja, Pete, Pai, Tong 2018-09-10
Highslide JS Table II Now contains Kate, Sow, Pao, Yai 2018-09-10
Highslide JS Table I Cream looks back at sister Kate while Yai looks on 2018-09-10
Highslide JS Ready for Dinner 20171020 Cream, Kate, Rick, Dan 2018-09-10
Highslide JS Soi Directs Doi Soi: "If you weren't my brother I'd fire you" ... Doi: "If you weren't my brother I'd quit" 2018-09-10
Highslide JS Creams Showing Off Cream doesn't own a matched pair of flip-flops - but it doesnn't seem to bother her 2018-09-10
Highslide JS Onlookers A small crowd begins to gather: This seems to be the most exciting thing happening today 2018-09-10
Highslide JS Beginning the Elecrical Connection Doi brings the main cable to the street as the PET installer wires the meter 2018-09-10