10/21/2017 AD built
Rick arrived early in the morning. There were several visitors as the crew of five worked feverishly on several fronts: Electrical system, bathroom floor, kitchen counters, and the ceiling!
Subjects Who or What built?
Objects To Whom or What was built?
-
Our House (Sisaket Bungalow) Our house in Sisaket is ...
Timelines (that include this event)
Attachments
Fix Bathroom Floor Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Cable Buried Meanwhile Soi and Doi were buried the electrical feed
Reattached to Meter The cable was reattached to the meter - try to do that i the US!
Electric Routed Inside Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
Ceiling Rafters After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Da Gaeo Visits Da Gaeo, Yai's older brother, stops by. Por Am's wife and daughter accompany Por Am to work most days, and Mae Duk is also around a lot
Da Jahn Visits 2017-10-20 Da Jahn visits us and his older sister Yai
Rick Explains Kitchen The built-in kitchen counter top is framed and poured according to Rick's instructions
Long Day Rick kicks back
Chair Games I Kate & Cream along with the masons' daughter play
Events in 2017 MORE
![Shane Bow](/uploads/ads/5.jpg)
![Thai Hangman](/uploads/ads/9.jpg)
![Thai Drills](/uploads/ads/10.jpg)
![alasnome](/uploads/ads/12.jpg)
![sirijanda](/uploads/ads/13.jpg)
![sirijanda](/uploads/ads/14.jpg)
![CrossFit F3](/uploads/ads/15.jpg)
![dcce](/uploads/ads/19.jpg)