Highslide JS
Visitors & Crew of Five

Visitors & Crew of Five
10/21/2017 AD built

Rick arrived early in the morning. There were several visitors as the crew of five worked feverishly on several fronts: Electrical system, bathroom floor, kitchen counters, and the ceiling!

Sisaket
Lattitude: 15.1186° N
Longitude: 104.322° E
Region: South East Asia
South East Asia
Modern Day Thailand
Subjects Who or What built?
Objects To Whom or What was built?
Timelines (that include this event)
Attachments
Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Fix Bathroom Floor — Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Photo Credit: (c) 2017 Muu
Fix Bathroom Floor Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Meanwhile Soi and Doi were buried the electrical feed
Cable Buried — Meanwhile Soi and Doi were buried the electrical feed
Photo Credit: (c) 2017 Muu
Cable Buried Meanwhile Soi and Doi were buried the electrical feed
The cable was reattached to the meter - try to do that i the US!
Reattached to Meter — The cable was reattached to the meter - try to do that i the US!
Photo Credit: (c) 2017 Muu
Reattached to Meter The cable was reattached to the meter - try to do that i the US!
Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
Electric Routed Inside — Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
Photo Credit: (c) 2017 Muu
Electric Routed Inside Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Ceiling Rafters — After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Photo Credit: (c) 2017 Muu
Ceiling Rafters After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Da Gaeo, Yai's older brother, stops by. Por Am's wife and daughter accompany Por Am to work most days, and Mae Duk is also around a lot
Da Gaeo Visits — Da Gaeo, Yai's older brother, stops by. Por Am's wife and daughter accompany Por Am to work most days, and Mae Duk is also around a lot
Photo Credit: (c) 2017 Muu
Da Gaeo Visits Da Gaeo, Yai's older brother, stops by. Por Am's wife and daughter accompany Por Am to work most days, and Mae Duk is also around a lot
2017-10-20 Da Jahn visits us and his older sister Yai
Da Jahn Visits — 2017-10-20 Da Jahn visits us and his older sister Yai
Photo Credit: (c) 2017 Muu
Da Jahn Visits 2017-10-20 Da Jahn visits us and his older sister Yai
The built-in kitchen counter top is framed and poured according to Rick's instructions
Rick Explains Kitchen — The built-in kitchen counter top is framed and poured according to Rick's instructions
Photo Credit: (c) 2017 Muu
Rick Explains Kitchen The built-in kitchen counter top is framed and poured according to Rick's instructions
Rick kicks back
Long Day — Rick kicks back
Photo Credit: (c) 2017 Muu
Long Day Rick kicks back
Kate & Cream along with the masons' daughter play
Chair Games I — Kate & Cream along with the masons' daughter play
Photo Credit: (c) 2017 Muu
Chair Games I Kate & Cream along with the masons' daughter play
Chair Games II
Photo Credit: (c) 2017 Muu
Chair Games III
Photo Credit: (c) 2017 Muu
per page
Events in 2017 MORE
Shane Bow Thai Hangman Thai Drills alasnome sirijanda sirijanda CrossFit F3 dcce