NAME ALIAS DESC WHEN
Highslide JS Front Bedroom Door Withe the door jambs in the bedrooms they are now really rooms 2018-08-09
Highslide JS Poor Light Wiring Soi cuts the walls for exterior lighting 2018-08-09
Highslide JS Hive of Activity With five workers the site is buzzing 2018-08-09
Highslide JS Bedroom Door Jamb Por Am & Ja install the bedroom door jambs. 2018-08-09
Highslide JS Kitchen Drain With Soi here, the plumbing also begins - here is the kitchen drain exiting the back wall of the house 2018-08-09
Highslide JS Door & Ceiling Materials Plywood and metal structure for the sub-ceiling arrives along with interior bedroom doors and jambs 2018-08-09
Highslide JS Ja Starts Bathroom Now that Soi has given the OK, the bathroom exterior wall can be started by Ja 2018-08-09
Highslide JS Electric Around Pillars At every pillar, the conduit must run vertically to the ceiling 2018-08-09
Highslide JS Soi Begins Electrical The walls need to be routed out for each electrical box as well as the conduit between them. 2018-08-09
Highslide JS Bricking in the Bedroom Doors 2018-08-08
Highslide JS Bought Electrical Materials Soi, Ja, and Ga load the truck with conduit, electrical cable, outlets, etc. We want lots of outlets in our small house 2018-08-08
Highslide JS Even More Cable 2018-08-08
Highslide JS More Cable 2018-08-08
Highslide JS Cable 2018-08-08