| NAME | ALIAS | DESC | WHEN | ||
|---|---|---|---|---|---|
|
Sealing Walls | The outer layer of mortar covers conduit and strengthens the bricks and makes everything look nice | 2018-08-09 | ||
|
Soi Routing | Soi carves a channel for the conduit. To his right, the living room wall is plastered | 2018-08-09 | ||
|
Plastering Liing Room | Por Am and Ja smooth the large living room wall now that the conduit and electrical boxes are in place | 2018-08-09 | ||
|
Full Crew | Soi begins electrical and plumbing systems, allowing the masons to continue finishing the internal walls. Also, door jambs and even the external bathroom wall are begun. An incredible flurry of work today. |
2018-08-09 | ||
|
Front Bedroom Door | Withe the door jambs in the bedrooms they are now really rooms | 2018-08-09 | ||
|
Poor Light Wiring | Soi cuts the walls for exterior lighting | 2018-08-09 | ||
|
Hive of Activity | With five workers the site is buzzing | 2018-08-09 | ||
|
Bedroom Door Jamb | Por Am & Ja install the bedroom door jambs. | 2018-08-09 | ||
|
Kitchen Drain | With Soi here, the plumbing also begins - here is the kitchen drain exiting the back wall of the house | 2018-08-09 | ||
|
Door & Ceiling Materials | Plywood and metal structure for the sub-ceiling arrives along with interior bedroom doors and jambs | 2018-08-09 | ||
|
Ja Starts Bathroom | Now that Soi has given the OK, the bathroom exterior wall can be started by Ja | 2018-08-09 | ||
|
Electric Around Pillars | At every pillar, the conduit must run vertically to the ceiling | 2018-08-09 | ||
|
Soi Begins Electrical | The walls need to be routed out for each electrical box as well as the conduit between them. | 2018-08-09 | ||
|
Bricking in the Bedroom Doors | 2018-08-08 | |||
|
Bought Electrical Materials | Soi, Ja, and Ga load the truck with conduit, electrical cable, outlets, etc. We want lots of outlets in our small house | 2018-08-08 | ||
|
Even More Cable | 2018-08-08 |