Highslide JS Sealing Walls The outer layer of mortar covers conduit and strengthens the bricks and makes everything look nice 2018-08-09
Highslide JS Soi Routing Soi carves a channel for the conduit. To his right, the living room wall is plastered 2018-08-09
Highslide JS Plastering Liing Room Por Am and Ja smooth the large living room wall now that the conduit and electrical boxes are in place 2018-08-09
Highslide JS Full Crew Soi begins electrical and plumbing systems, allowing the masons to continue finishing the internal walls.
Also, door jambs and even the external bathroom wall are begun. An incredible flurry of work today.
2018-08-09
Highslide JS Front Bedroom Door Withe the door jambs in the bedrooms they are now really rooms 2018-08-09
Highslide JS Poor Light Wiring Soi cuts the walls for exterior lighting 2018-08-09
Highslide JS Hive of Activity With five workers the site is buzzing 2018-08-09
Highslide JS Bedroom Door Jamb Por Am & Ja install the bedroom door jambs. 2018-08-09
Highslide JS Kitchen Drain With Soi here, the plumbing also begins - here is the kitchen drain exiting the back wall of the house 2018-08-09
Highslide JS Door & Ceiling Materials Plywood and metal structure for the sub-ceiling arrives along with interior bedroom doors and jambs 2018-08-09
Highslide JS Ja Starts Bathroom Now that Soi has given the OK, the bathroom exterior wall can be started by Ja 2018-08-09
Highslide JS Electric Around Pillars At every pillar, the conduit must run vertically to the ceiling 2018-08-09
Highslide JS Soi Begins Electrical The walls need to be routed out for each electrical box as well as the conduit between them. 2018-08-09
Highslide JS Bricking in the Bedroom Doors 2018-08-08
Highslide JS Bought Electrical Materials Soi, Ja, and Ga load the truck with conduit, electrical cable, outlets, etc. We want lots of outlets in our small house 2018-08-08
Highslide JS Even More Cable 2018-08-08