NAME ALIAS DESC WHEN
Highslide JS Offloading Materials One of the twins 2018-08-01
Highslide JS Materials Arrive Materials ordered by twins arrive 2018-08-01
Highslide JS Unloading materials 2018-08-01
Highslide JS Install Windows 2018-07-30
Highslide JS Install Windows 2018-07-30
Highslide JS Install Windows 2018-07-30
Highslide JS Install Windows 2018-07-30
Highslide JS Install Windows 2018-07-30
Highslide JS Install Windows 2018-07-30
Highslide JS Install Windows 1 2018-07-30
Highslide JS Not plumb - Ham drives When Rick arrived he noticed that one of the walls in progress was not plumb. Had the team take it down and redo it. In a way it was fortunate that it happened early on, because the team learned quickly that quality is required.
While they worked Ham again took Muu shopping, this time with Rick.
By the end of the day the workers were installing the rebar to support the windows.
2018-07-30
Highslide JS Window Rebar 2018-07-30
Highslide JS Ham drives 2018-07-30
Highslide JS Ready to redo it 2018-07-30
Highslide JS Took it down 2018-07-30
Highslide JS Not Plumb 2018-07-30