Highslide JS Exterior Walls to Rafters The exterior walls have now reached the bottom of the roof steel. Except, of course, for the bathroom and the front door. 2018-08-04
Highslide JS Door Installation Once the door finally arrived the installation went quickly without any problems 2018-08-04
Highslide JS Door Enroute Yep.. another photo sent from the door manufacturer, "The door is on its way" 2018-08-04
Highslide JS Waiting for truck A short while later, the manufacturer sent another photo, "all done, waiting for a truck" 2018-08-04
Highslide JS Door Assembly Sent by the door manufacturer to assure us that the door really was coming today! 2018-08-04
Highslide JS Front Door Installed The front door is finally installed 2018-08-04
Highslide JS Scaffolding Inside The scaffolding is poised for applying the plaster to the walls 2018-08-04
Highslide JS How big is this? It's time to get serious about the bathroom. Muu sends a photo of the measurement as the safer alternative to actually reading the tape! 2018-08-04
Highslide JS Inside Even with the missing interior wall, now that the exterior walls meet the roof structure, it feels like you are actually inside the house 2018-08-04
Highslide JS Front Ready for Door 2017-09-16 2018-08-04
Highslide JS Paat Ham & Teen's eldest child. He works hard and plays hard. Currently works in a hotel in Bangkok. 2018-08-04
Highslide JS Paat 2018-01-30 2018-08-04
Highslide JS Masonry Continues Walls getting higher. Started to fix the front corner of the house to be interlaced. 2018-08-04
Highslide JS Fuk 2017 2017-10-26 2018-08-04
Highslide JS Fuk Helps Fuk hangs out at the construction site and acts as a gopher for the workers. 2018-08-04
Highslide JS Front Door Ordered We ordered a front door, so now we know the size required. So, the masons have now begun to interlace the bricks on the front corner 2018-08-04