Recent Updates
NAME | ALIAS | DESC | WHEN | ||
---|---|---|---|---|---|
Back Walls | 2017-09-115: From the back of the house, looking at the kitchen and back bedroom to the right. | 2018-08-03 | |||
Muu gets driver's license | The day after we bought the car, Muu began driver school. Less than a month later she passes the written and driving exams to earn her license. | 2018-08-03 | |||
Ga | แกะ | Little guy who helped Ja and Por Am | 2018-08-02 | ||
Corn! | Muu bought a very large bag of corn to plant - Exciting!! | 2018-08-02 | |||
Noy catches up | Noy chats with Yai in the foreground. Kate, Cream, and Pao are in the Back, In the middle are Ham and Ja. | 2018-08-02 | |||
Cream & Pao | Family and friends gather on Noy's porch: Cream & Pao are the girls in the foreground. | 2018-08-02 | |||
Noy & Sue Visit | 2018-08-02 | ||||
Front Bedroom Takes Shape | More materials ordered and delivered today including the tubs that will be used to make the septic tanks. The masonry also continued as the walls rose to the tops of the windows in the front of the house. The back of the house | 2018-08-02 | |||
End of the day | Looking through the living room to the kitchen in the back of the house: The back wall is finally started - 5 courses. The kitchen and back bedroom will get windows tomorrow. | 2018-08-02 | |||
No Front Door | By the end of the day looking at the front and side of the house. The large opening is for the front door. We will need to interlace the bricks at this corner, but are waiting to order and measure the actual door to center it. | 2018-08-02 | |||
Delivery | Another load of bricks and mortar arrives. In the background is the back of the house: The kitchen and back bedroom doors are in place, but only partially bricked into place. | 2018-08-02 | |||
No Bathroom | Standing in the kitchen looking toward the front bedroom, notice that the bathroom doesn't even have a floor: Still waiting on a final design and plumbing. | 2018-08-02 | |||
Room Divider | Here the short dividing wall between the kitchen and living rooms has been built beside the kitchen door. | 2018-08-02 | |||
Kitchen Door | Ja is bricking in the kitchen sliding door. The back wall of the kitchen has not been started because they are waiting for the sink drain to be plumbed. | 2018-08-02 | |||
Walls climb to Window Tops | 2018-08-02 | ||||
Windows! | Today the windows started going in. A layer of rebar was laid yesterday to give added strength to the walls with windows. Today, the windows were set and leveled using a parir of sticks for support. | 2018-08-02 |