10/04/2017 AD built

Soi begins electrical and plumbing systems, allowing the masons to continue finishing the internal walls.
Also, door jambs and even the external bathroom wall are begun. An incredible flurry of work today.

Sisaket
Lattitude: 15.1186° N
Longitude: 104.322° E
Region: South East Asia
South East Asia
Modern Day Thailand
Subjects Who or What built?
Objects To Whom or What was built?
Timelines (that include this event)
Attachments
Highslide JS
Soi Begins Electrical — The walls need to be routed out for each electrical box as well as the conduit between them.
Photo Credit: (c) 2017 - Muu
Soi Begins Electrical The walls need to be routed out for each electrical box as well as the conduit between them.
Highslide JS
Electric Around Pillars — At every pillar, the conduit must run vertically to the ceiling
Photo Credit: (c) 2017 - Muu
Electric Around Pillars At every pillar, the conduit must run vertically to the ceiling
Highslide JS
Ja Starts Bathroom — Now that Soi has given the OK, the bathroom exterior wall can be started by Ja
Photo Credit: (c) 2017 - Muu
Ja Starts Bathroom Now that Soi has given the OK, the bathroom exterior wall can be started by Ja
Highslide JS
Door & Ceiling Materials — Plywood and metal structure for the sub-ceiling arrives along with interior bedroom doors and jambs
Photo Credit: (c) 2017 - Muu
Door & Ceiling Materials Plywood and metal structure for the sub-ceiling arrives along with interior bedroom doors and jambs
Highslide JS
Kitchen Drain — With Soi here, the plumbing also begins - here is the kitchen drain exiting the back wall of the house
Photo Credit: (c) 2017 - Muu
Kitchen Drain With Soi here, the plumbing also begins - here is the kitchen drain exiting the back wall of the house
Highslide JS
Bedroom Door Jamb — Por Am & Ja install the bedroom door jambs.
Photo Credit: (c) 2017 - Muu
Bedroom Door Jamb Por Am & Ja install the bedroom door jambs.
Highslide JS
Hive of Activity — With five workers the site is buzzing
Photo Credit: (c) 2017 - Muu
Hive of Activity With five workers the site is buzzing
Highslide JS
Poor Light Wiring — Soi cuts the walls for exterior lighting
Photo Credit: (c) 2017 - Muu
Poor Light Wiring Soi cuts the walls for exterior lighting
Highslide JS
Front Bedroom Door — Withe the door jambs in the bedrooms they are now really rooms
Photo Credit: (c) 2017 - Muu
Front Bedroom Door Withe the door jambs in the bedrooms they are now really rooms