Began plastering interior walls
Began plastering interior walls
10/05/2017 AD built
With the electrical conduit in place, the masons can now plaster the large living room wall.
Soi continues install conduit and wire electrical boxes.
Sisaket
Lattitude: 15.1186° N
Longitude: 104.322° E
Region: South East Asia
Modern Day Thailand
Subjects Who or What built?
Objects To Whom or What was built?
Timelines (that include this event)
Attachments
Soi Routing — Soi carves a channel for the conduit. To his right, the living room wall is plastered
Photo Credit: (c) 2017 - Muu
Soi Routing
Soi carves a channel for the conduit. To his right, the living room wall is plastered
Sealing Walls — The outer layer of mortar covers conduit and strengthens the bricks and makes everything look nice
Photo Credit: (c) 2017 - Muu
Sealing Walls
The outer layer of mortar covers conduit and strengthens the bricks and makes everything look nice
Guard Dog? — Actually a very gentle soul is Dtan - great dog
Photo Credit: (c) 2017 - Muu
Guard Dog?
Actually a very gentle soul is Dtan - great dog
Working Together — There seems to be good cooperation between Soi doing electrical and Ja/Por Am the masonry
Photo Credit: (c) 2017 - Muu
Working Together
There seems to be good cooperation between Soi doing electrical and Ja/Por Am the masonry
Electrical Wiring — Wiring a brick house is much more difficult than with studs
Photo Credit: (c) 2017 - Muu
Electrical Wiring
Wiring a brick house is much more difficult than with studs
Smoothing — Por Am smooths the small wall between living and kitchen areas
Photo Credit: (c) 2017 - Muu
Smoothing
Por Am smooths the small wall between living and kitchen areas