Contributor
Shane BowStudent, Philosopher, Writer, Developer
After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Ceiling Rafters — After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Photo Credit: (c) 2017 Muu
Ceiling Rafters After the electrical work, Soi moved on to the steel ceiling rafters and plywood sub ceiling. Eventually, there will be a dropped ceiling below this and insulation above
Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
Electric Routed Inside — Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
Photo Credit: (c) 2017 Muu
Electric Routed Inside Not quite how I envisioned it, but this box will eventually be inside the enclosed back porch - so it will do.
The cable was reattached to the meter - try to do that i the US!
Reattached to Meter — The cable was reattached to the meter - try to do that i the US!
Photo Credit: (c) 2017 Muu
Reattached to Meter The cable was reattached to the meter - try to do that i the US!
Meanwhile Soi and Doi were buried the electrical feed
Cable Buried — Meanwhile Soi and Doi were buried the electrical feed
Photo Credit: (c) 2017 Muu
Cable Buried Meanwhile Soi and Doi were buried the electrical feed
Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Fix Bathroom Floor — Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Photo Credit: (c) 2017 Muu
Fix Bathroom Floor Arrived to find that bathroom had a two tiered floor - Ja, Ga, and Por Am had to take our a large portion and repour
Rick Explains
Photo Credit: (c) 2017 Muu
Two completed Thai-style septic tanks!
Grade & Cover — Two completed Thai-style septic tanks!
Photo Credit: (c) 2017 Muu
Grade & Cover Two completed Thai-style septic tanks!
Back-fill with gravel
Add Rock — Back-fill with gravel
Photo Credit: (c) 2017 Muu
Add Rock Back-fill with gravel
Dig two holes 8 feet deep and 3 feet across and install the concrete
Dig Holes — Dig two holes 8 feet deep and 3 feet across and install the concrete "sleeves"
Photo Credit: (c) 2017 Muu
Dig Holes Dig two holes 8 feet deep and 3 feet across and install the concrete "sleeves"
Septic Tanks Installed
Photo Credit: (c) 2017 Muu
2018-04-13
Mae Duk — 2018-04-13
Photo Credit: (c) 2018 Muu
Mae Duk 2018-04-13