More materials ordered and delivered today including the tubs that will be used to make the septic tanks. The masonry also continued as the walls rose to the tops of the windows in the front of the house. The back of the house
Subjects Who or What built?
Objects To Whom or What was built?
-
Our House (Sisaket Bungalow) Our house in Sisaket is ...
Timelines (that include this event)
Attachments
Delivery Another load of bricks and mortar arrives. In the background is the back of the house: The kitchen and back bedroom doors are in place, but only partially bricked into place.
Kitchen Door Ja is bricking in the kitchen sliding door. The back wall of the kitchen has not been started because they are waiting for the sink drain to be plumbed.
Room Divider Here the short dividing wall between the kitchen and living rooms has been built beside the kitchen door.
No Bathroom Standing in the kitchen looking toward the front bedroom, notice that the bathroom doesn't even have a floor: Still waiting on a final design and plumbing.
No Front Door By the end of the day looking at the front and side of the house. The large opening is for the front door. We will need to interlace the bricks at this corner, but are waiting to order and measure the actual door to center it.
End of the day Looking through the living room to the kitchen in the back of the house: The back wall is finally started - 5 courses. The kitchen and back bedroom will get windows tomorrow.
Events in 2017 MORE
![Shane Bow](/uploads/ads/5.jpg)
![Thai Hangman](/uploads/ads/9.jpg)
![Thai Drills](/uploads/ads/10.jpg)
![alasnome](/uploads/ads/12.jpg)
![sirijanda](/uploads/ads/13.jpg)
![sirijanda](/uploads/ads/14.jpg)
![CrossFit F3](/uploads/ads/15.jpg)
![dcce](/uploads/ads/19.jpg)