Back to Sisaket
09/30/2017 AD visited
Returned to Sisaket, after a hectic week in Bangkok, to find that the exterior walls are now finished and plastered - except of course, the bathroom which is not even started.
he focus will shift to electrical and plumbing now that the basic shell is built.
Subjects Who or What visited?
-
Rick The farang - Muu's boyfr...
-
Muu Shortly after Muu was bo...
-
Tong (Dong) Person
Objects To Whom or What was visited?
-
Our House (Sisaket Bungalow) Our house in Sisaket is ...
Timelines (that include this event)
Attachments
Front of House Looking straight on at the house: The window is the front bedroom, and the door leads into the living area. Noy's house is in the background.
No Bathroom View from the front left corner of the house. The two windows of the front bedroom are visible, as is the back bedroom window. The gap is the bathroom
Back of House The kitchen door and window, and the back bedroom door. Eventually there will be an enclosed wrapping around the two sides of the house visible here, as well as the front door.
Events in 2017 MORE
![Shane Bow](/uploads/ads/5.jpg)
![Thai Hangman](/uploads/ads/9.jpg)
![Thai Drills](/uploads/ads/10.jpg)
![alasnome](/uploads/ads/12.jpg)
![sirijanda](/uploads/ads/13.jpg)
![sirijanda](/uploads/ads/14.jpg)
![CrossFit F3](/uploads/ads/15.jpg)
![dcce](/uploads/ads/19.jpg)