Masonry Continues
Masonry Continues
09/16/2017 AD built
Walls getting higher. Started to fix the front corner of the house to be interlaced.
Sisaket
Lattitude: 15.1186° N
Longitude: 104.322° E
Region: South East Asia
Modern Day Thailand
Subjects Who or What built?
Objects To Whom or What was built?
Timelines (that include this event)
Attachments
Missing Inside Walls — This is the view from inside the back bedroom - looking into the kitchen. There is still no inside wall (between the two pillars in the foreground)
Photo Credit: (c) 2017 - Muu
Missing Inside Walls
This is the view from inside the back bedroom - looking into the kitchen. There is still no inside wall (between the two pillars in the foreground)
Front Door Ordered — We ordered a front door, so now we know the size required. So, the masons have now begun to interlace the bricks on the front corner
Photo Credit: (c) 2017 - Muu
Front Door Ordered
We ordered a front door, so now we know the size required. So, the masons have now begun to interlace the bricks on the front corner
Fuk Helps — Fuk hangs out at the construction site and acts as a gopher for the workers.
Photo Credit: (c) 2017 - Muu
Fuk Helps
Fuk hangs out at the construction site and acts as a gopher for the workers.