09/16/2017 AD built

Walls getting higher. Started to fix the front corner of the house to be interlaced.

Sisaket
Lattitude: 15.1186° N
Longitude: 104.322° E
Region: South East Asia
South East Asia
Modern Day Thailand
Subjects Who or What built?
Objects To Whom or What was built?
Timelines (that include this event)
Attachments
Highslide JS
Missing Inside Walls — This is the view from inside the back bedroom - looking into the kitchen. There is still no inside wall (between the two pillars in the foreground)
Photo Credit: (c) 2017 - Muu
Missing Inside Walls This is the view from inside the back bedroom - looking into the kitchen. There is still no inside wall (between the two pillars in the foreground)
Highslide JS
Front Door Ordered — We ordered a front door, so now we know the size required. So, the masons have now begun to interlace the bricks on the front corner
Photo Credit: (c) 2017 - Muu
Front Door Ordered We ordered a front door, so now we know the size required. So, the masons have now begun to interlace the bricks on the front corner
Highslide JS
Fuk Helps — Fuk hangs out at the construction site and acts as a gopher for the workers.
Photo Credit: (c) 2017 - Muu
Fuk Helps Fuk hangs out at the construction site and acts as a gopher for the workers.